• Littleton Adventist
  • Littleton Adventist Reception

Hospital and Medical Facility Projects

Littleton Adventist Hospital

Centura Health
  • Existing Systems Evaluation
  • Lighting Design
  • Power Distribution Systems Design
  • Selective Protective Coordination Studies

For this project, we provided electrical engineering and lighting design for the 81,000 square foot, two-story expansion. A fourth floor Med/Surgery area and fifth floor ICU were added above the existing three-story South Tower. A new elevator bank tower was added to support the two floor addition. This required modifications to the lower four floors to accommodate access to the new elevator. Four new operating rooms and associated support space were constructed within the existing second floor shell space. Also included in this project was the expansion of the Central Utility Plant (CUP) to house new 8,000 amp 480 volt paralleling switchgear to connect the three existing emergency generators and future generators. Since the completion of this project, we have been invited back to design over a dozen more projects.