Airport and Aviation Projects

Below is a summary list of representative projects completed by our firm. For specific details of projects listed please contact our office. Highlighted projects are included with links on left.

  • Centennial Airport Kooi Hangar
  • Boston Logan Airport TSA Security Checkpoint Upgrades
  • Chicago O'Hare Airport TSA Security Checkpoint Upgrades
  • Colorado Springs Airport TSA Security Checkpoint Upgrades
  • Pueblo Airport TSA Security Checkpoint Upgrades
  • Transportation Safety Administration (TSA)
  • Denver International Airport (DIA) Canopy/Roadway
  • Stapleton International Airport Concourses C & D
  • (AGTS) UPS Room
Denver International Airport (DEN)
  • DIA 78th Avenue Improvements
  • DIA Commercial Vehicle Storage Facility
  • DIA Terminal, Landside Terminal Complex (LTC)
  • DIA Canopy Inverter Mechanical
  • DIA Communications Center Break room
  • DIA Terminal Smoke Fans Addition
  • DIA FedEx Facility Expansion
  • DIA On-Call Mechanical Electrical (ME) 2000
  • DIA M/E Garage Daylight Adaptor
  • DIA T1 Road Lighting
  • DIA Concourse A General Services Administration (GSA)
  • DIA Dollar Thrifty Site
  • DIA Redesign of Main Terminal
  • DIA Terminal Continental Tunnel Study
  • DIA Terminal Automated Ground Transportation System
  • DIA Terminal Grounding 5/6 Security
  • DIA Terminal Skydance Art
  • DIA Terminal United Modifications
  • DIA Terminal Garage Addition
  • DIA Terminal P/A System
  • DIA Garage Revision to Existing Garage
  • DIA Terminal Security Revisions
  • DIA Terminal Curbside Fire Protection
  • DIA Terminal Security Revision 2
  • DIA Terminal F/A P/A Revision
  • DIA Terminal Commercial Vehicle Staging
  • DIA Terminal Curbside Shelters 5
  • DIA Terminal Escalators/Elevators
  • DIA Terminal Tenant Criteria Rep
  • DIA Security Pavilion Furniture, Fixtures and Equipment Signage
  • DIA Site Construction Service
  • DIA Posting Drawings
  • DIA Moving Cable Tray
  • DIA Access Control Plaza
  • DIA United, Level 3 Tenant Finish
  • DIA United Main Terminal Fitup, UPS, and Communications Rooms
  • DIA Rental Car Offices Re-design
  • DIA Airport Operations ID
  • DIA Terminal Rental Car Level 5
  • DIA Terminal Ground Transportation Office
  • DIA Terminal BAE Maintenance Facility
  • DIA Terminal Luggage Storage, Level 5
  • DIA Terminal Water Feature Integration
  • DIA Baggage Power Distribution
  • DIA Level 1, Area 11 A/C
  • DIA Level 3, Communications Room
  • DIA Level 1, 11 B/D Maintenance Shop
  • DIA Site Services – On-Call
  • DIA Indian Art Installation
  • DIA As-Built Drawings
  • DIA AGTS Train Maintenance Facility
  • DIA AGTS Power Distribution
  • DIA AGTS Communications System Revisions
  • DIA AGTS Secured Barrier Wall (SBW) Addition of Conduit and Boxes
  • DIA AGTS Equipment Room Special Systems
  • DIA North Terminal Area (NTA)
  • DIA NTA Fiber Optic Room
  • DIA NTA Bridge Coordination
  • DIA NTA 5th Floor Architectural Revision
  • DIA NTA Public Service of Colorado Primary Duct Banks
  • DIA NTA Westinghouse AGTS
  • DIA NTA Park Administration Baggage
  • DIA NTA Maintenance Administration Control
  • DIA NTA Federal Airport Administration (FAA) Offices
  • DIA NTA Denver Police Department
  • DIA NTA Information Center
  • DIA TCI High Definition Television
  • DIA NTA Site Services
  • DIA NTA As-Builts
  • DIA Office Building (AOB)
  • DIA AOB Coordination Command Center
  • DIA AOB US West
  • DIA AOB F/A P/A Security Revisions
  • DIA AOB Security Gates
  • DIA AOB US West Tenant Finish
  • DIA AOB Furniture Revisions
  • DIA AOB Site Services
  • DIA AOB As-Built Drawings
  • DIA Passenger Bridge
  • DIA BAE Power Study
  • DIA Construction Support Facility
  • DIA Construction Support Expansion #2
  • DIA AGTS Deep Time Deep Space
  • DIA US West
  • DIA Parking Ground Transportation
  • DIA Power Load Analysis
  • DIA United Ground Service Equipment (GSE)
  • DIA United Hanger Facility
  • DIA Continental GSE
  • DIA Continental GSE Building Reduct
  • DIA Continental Site Services
  • DIA Continental In-Flight Kitchen
  • DIA Continental South Site
  • DIA Continental Hangar Systems
  • DIA Continental North Site
  • DIA Continental Estimating
  • DIA Continental CAD Translations
  • DIA Continental Express and Revisions
  • DIA Continental Presidents Club
  • DIA American Airlines Admirals Club
  • DIA Continental Pneumatic Tubing
  • DIA Smarte Carte Vending Equipment
  • DIA Gary Sweeney Art Walls
  • DIA Project Management Team (PMT) Art Work
  • DIA Value Rent-A-Car, Terminal Building
  • DIA Airport Concessions Warehouse Concourse C
  • DIA Airport Concessions Concourse A
  • DIA Backup Bags Modifications 2&3
  • DIA Backup Bag Modifications 1w&1&2e
  • DIA Alternate Bag Inbound Terminal
  • DIA Alternate Bag Inbound Federal Inspection Service (FIS)
  • DIA Alternate Bag, After Opening
  • DIA United Terminal Bag Alternate
  • DIA United/BAE Bag System Modifications
  • DIA United/BAE Lighting Revisions
  • DIA Alternate Bag Special Systems
  • DIA Baggage Tunnel Lighting
  • DIA Term Contract
  • DIA Skydance Artwork & Lighting Control, Construction Administration
  • DIA Press / Conference Room
  • DIA Delongs Conference Room Remodel
  • DIA Final Commissioning
  • DIA AMR/Combs Hangar “A”
  • DIA Cameras Level 6 United Airlines (UA)
  • DIA American Airlines Ticket Counter
  • DIA Surface Parking Lot Expansion
  • DIA ME Term Contract 1996
  • DIA ME #1 Turnstyle Building
  • DIA ME #2 Ground Water
  • DIA ME #3 Incinerator
  • DIA ME #4 FIDS Level 4
  • DIA ME #5 AGTS/UPS Rooms
  • DIA ME #6 “C” Floor Repair
  • DIA ME #7 Terminal Fountain
  • DIA ME #8 “C” Floor Repair Construction
  • DIA ME #9 Foam System Revisions
  • DIA ME #12 Concourse A FAA K-9
  • DIA ME #13 Fountain Redesign
  • DIA ME #14 Concourse B Sprinklers
  • DIA ME #15 AOB Miscellaneous Computers
  • DIA ME #16 Miscellaneous Mechanical Project
  • DIA ME #17 Utilities Tunnel Sump Pump
  • DIA ME #18 Mechanical Design Standards
  • DIA ME #19 Concourse Miscellaneous Mechanical
  • DIA ME #20 Concourse A/B Fire
  • DIA ME #21 Deluge Valve Addition
  • DIA ME #22 Terminal Potable Water
  • DIA ME #23 New Parking Lot
  • DIA ME #24 Fountain Site Work
  • DIA ME #25 Terminal Booster Pump
  • DIA ME #26 Concourse A, B, & C Flex Connectors
  • DIA ME #27 Concourse B Booth Relocate
  • DIA ME #28 Concourse A Access Door
  • DIA ME #29 AOB 7th Floor Remodel
  • DIA ME #31 AGTS Administration Concourse C
  • DIA ME #32 Training Room Concourse B
  • DIA ME #33 Revision “C” Pump Room
  • DIA ME #34 “A, B, C” Tug Room Ramps
  • DIA ME #35 T Boost Pump Construction Docs
  • DIA Baggage Maintenance
  • DIA Baggage System Permanent Interface Ph 2
  • DIA Phone Card Vending
  • DIA – A Massage, Inc.
  • DIA Elevators at Train Station
  • DIA Modification 3E Oversize Baggage Lift
  • DIA Modification 2W Baggage Lift Extension
  • DIA Premises Wiring Study
  • DIA United Mail Sort Conveyor
  • DIA Terminal Modifications ½ West Level 5E
  • DIA UA Bag Scanner / Conveyor
  • DIA Concourse A and C Signage
  • DIA Modification 1W Level 6 Transfer Unit
  • DIA Lift Station
  • DIA AGTS Maintenance Expansion
  • DIA Concourse B West UA Mail Sort